Title
Concrete structures mandated for short bridges
Law
Dpwh Department Order No. 30, S. 2011
Decision Date
May 16, 2011
Rogelio L. Singson mandates the use of concrete structures for permanent bridges up to 30 meters in length, specifying design criteria to ensure cost-effectiveness and the use of locally available materials.
A

Purpose and Objective

  • To ensure cost-effective bridge designs.
  • To promote the use of locally available materials in bridge construction projects.

Criteria for Selection of Concrete Structures Based on Span Length

  • Bridges with span lengths of 6 to 12 meters: use flat slab bridges.
  • Bridges with span lengths of 13 to 20 meters: use reinforced concrete deck girder (RCDG) bridges.
  • Bridges with span lengths of 21 to 30 meters: use prestressed concrete girder (PSCG) bridges.

Implementation and Effectivity

  • The order takes effect immediately upon adoption.
  • Issued by the Secretary of DPWH on 16 May 2011.

Important Legal Concepts

  • Standardization of bridge construction materials and methods within specified span lengths.
  • Promotion of economic efficiency through material choice and design.
  • Administrative directive with binding effect on all DPWH offices concerned, except already ongoing projects.

Analyze Cases Smarter, Faster
Jur helps you analyze cases smarter to comprehend faster, building context before diving into full texts. AI-powered analysis, always verify critical details.