Title
DOTC Lead Agency for Northrail-Southrail Project
Law
Administrative Order No. 134
Decision Date
Dec 27, 2005
The Department of Transportation and Communications (DOTC) is designated as the lead agency for the implementation of the Northrail-Southrail Linkage Project, tasked with addressing dangers at level crossings, repairing bridges, standardizing track gauge, ensuring compatibility of signaling systems, interconnecting various rail systems, and relocating informal settlers.

Law Summary

Objectives and Context of the Project

  • The project aims to decongest Metro Manila through railway and road development.
  • It supports the government's initiative to establish new government centers and modernize infrastructure.
  • Establishing a national railway system is aligned with the rejuvenation and reengineering of the country’s physical infrastructure.

Key Issues Identified for Resolution

  1. Risks posed by the existing Philippine National Railways (PNR) system, particularly at 97 level-road crossings (46 from Caloocan to Alabang and 51 from Alabang to Calamba).
  2. Structural integrity and repair of 76 bridges (37 from Caloocan to Alabang and 39 from Alabang to Calamba).
  3. Standardization of the railway track gauge, whether to retain the existing narrow gauge or convert to standard gauge.
  4. Ensuring compatibility between signaling and communication systems of the Northrail and Southrail lines.
  5. Interconnection of various rail systems including Metro Rail Transit (MRT), Light Rail Transit (LRT), Northrail at Sangandaan, and the links to Ninoy Aquino International Airport (NAIA) and Manila Domestic Airport.
  6. Relocation plans for informal settlers affected by the project.

Specific Tasks of the DOTC

  • Conduct studies and propose solutions addressing the continued dangers at railway crossings.
  • Manage repair and maintenance plans for identified bridges.
  • Evaluate and decide on track gauge standardization.
  • Coordinate integration of signaling and communication systems across north and south rail lines.
  • Facilitate interconnection of MRT, LRT, Northrail, and airport transit systems.
  • Oversee the relocation process of informal settlers impacted by railway development.

Inter-agency Coordination and Support

  • DOTC is to seek and coordinate support from several agencies and entities, notably:
    • National Economic Development Authority (NEDA)
    • Department of Finance (DOF)
    • Department of Budget and Management (DBM)
    • Department of Public Works and Highways (DPWH)
    • Metro Manila Development Authority (MMDA)
    • Philippine National Railways (PNR)
    • National Labor Relations Commission (NLRC)
    • National Housing Authority (NHA)
    • Local government representatives from Caloocan, Manila, Pasay, Taguig, Muntinlupa, Calamba, and the Province of Laguna

Reporting Requirements

  • The DOTC, alone or via collaborating agencies, shall submit an initial report and recommendations to the Office of the President within two months from convening.

Authority to Call for Assistance

  • DOTC is authorized to request assistance from any other government agencies deemed necessary for fulfilling its responsibilities.
  • All government agencies are directed to fully cooperate with DOTC in the project’s implementation.

Effectivity

  • This administrative order takes effect immediately upon issuance, signifying urgency and priority in project execution.