Legal basis and PEZA authorization
- Republic Act No. 7916 is the governing statute under which the President creates and designates the IT center, as amended by Republic Act No. 8748.
- The President acts upon recommendation of the Board of Directors of the Philippine Economic Zone Authority (PEZA).
- The designation is made subject to the Implementing Rules and Regulations (IRR) of Republic Act No. 7916, including all applicable amendments.
PEZA resolutions incorporated by reference
- The proclamation references PEZA Board of Directors Resolution No. 00-411 (s. 2000).
- The proclamation recognizes Resolution No. 11-066 (s. 2011) as an amendment to the earlier PEZA resolution.
- The proclamation recognizes Resolution No. 11-216 (s. 2011) as an amendment to the earlier PEZA resolution.
- The IT-center designation is treated as created and designated subject to these PEZA Board resolutions and the IRR implementing Republic Act No. 7916.
Designation as IT Center
- GT Times Square Cebu is created and designated as an Information Technology (IT) Center.
- The designation covers a building being constructed on specified parcels of land.
- The IT-center designation is expressly made subject to the provisions of Republic Act No. 7916 as amended, and its IRR.
- The location is identified as J. Llorente corner Don Mariano Cui Streets, Capitol Site, Cebu City, Cebu.
Covered property and boundaries
- The designated area has an aggregate land area of ONE THOUSAND ONE HUNDRED NINETY-TWO (1,192) SQUARE METERS, more or less.
- The land is defined through technical descriptions covering two lots under separate technical titles and parcel plans.
- The technical descriptions identify the properties under TCT No. 181282 and TCT No. 181283.
- The description uses the following plan and survey references: Pcs-628, Pcs-928, Fls-295, and GLRO Rec. No. 5988.
Parcel under TCT No. 181282 (Lot 1, Block 3)
- Under TCT No. 181282, the parcel is identified as Lot 1, Block 3, Pcs-628.
- The parcel is bounded NE by Road Lot 2; SE by Road Lot 2, Lot 522-A-2 (plan Fls-295), and Road Lot 4; SW by Lot 2, Block 3; and NW by Lot 4, Block 3.
- The parcel contains an area of Five Hundred Ninety-Six (596) Square Meters, more or less.
- The boundary bearings and points are traced from a beginning point marked “a1?” and continue through successive bearings and distances (including N. 39 deg. 38' E. and subsequent courses), with points referenced to plan indicators and monument markings.
- The technical description states a declination of 1 deg. 22' E. and gives the survey dates as August 1906 a July 1907, and subdivision survey dates as August 7-12, 1937.
Parcel under TCT No. 181283 (Lot 2, Block 3)
- Under TCT No. 181283, the parcel is identified as Lot 2, Block 3, Pcs-928.
- The parcel is bounded NE by Lot 1, Block 3; SE by Road Lot 4; SW by Road Lot 3; and NW by Lot 3, Block 3.
- The parcel contains an area of Five Hundred Ninety-Six (596) Square Meters, more or less.
- The technical description traces the boundary from a beginning point marked “a1?” and proceeds through successive bearings and distances (including N. 39 deg. 38' E. and subsequent courses), with points referenced to plan indicators and monument markings.
- The technical description states a declination of 1 deg. 22' E. and gives the survey dates as August 1906 a July 1907, and subdivision survey dates as August 7-12, 1937.
Execution and presidential certification
- The President certifies execution and affixes the seal of the Republic of the Philippines.
- The proclamation is DONE, in the City of Manila, on February 14, 2012.
- BENIGNO S. AQUINO III signs as President of the Philippines.
- PAQUITO N. OCHOA, JR. signs as Executive Secretary.