Title
Guidelines for Quarterly Validation of OMR
Law
Lto Memorandum Circular No. Vpt-2010-1375
Decision Date
Aug 5, 2010
The LTO establishes quarterly validation guidelines for Optical Mark Reader (OMR) software and hardware to ensure the accuracy and integrity of the Automated Driver's License Examination System, mandating on-site testing and corrective actions for discrepancies.

Governing office and purpose

  • The Memorandum Circular recognizes that the Optical Mark Reader software and hardware is a vital part of the Driver’s License System Core Application Module and the Automated Driver’s License Examination System (ADLES).
  • The Memorandum Circular provides the guidelines to ensure proper utilization of the facility and to monitor performance of the OMR software and hardware.
  • The Memorandum Circular requires observance of OMR validation standards aligned with the Quality Management System of the Office.
  • The Memorandum Circular establishes rules for quarterly validation, including both software validation and hardware testing.

Coverage: validation teams, sites, and materials

  • The Memorandum Circular requires the ITPEMC Technical Team and the ITPEMC-DLS Team to conduct the validation test.
  • Validation must be conducted on site every quarter of the year.
  • At least two (2) sites for every quarter must be subjected for testing, or as the need arises.
  • The Memorandum Circular requires that test sites be identified by the teams.

Software validation: required transactions and pass/fail

  • The Memorandum Circular requires the validation test to use transactions that test the accuracy and effectiveness of the OMR randomly.
  • The transactions used for random testing are exactly:
    • 2 New Non Pro
    • 2 New Pro
    • 2 Non Pro Dormant
    • 2 Pro Dormant
    • 2 Non Pro to Pro
    • 2 ARC
    • 2 New Conductors License
  • The Memorandum Circular requires that the answer sheet be shaded and checked in accordance with the Automated Exam Guidelines.
  • The Memorandum Circular declares the validation passed if all results obtained from the script and manual checking tally with the results given by the OMR software.
  • The Memorandum Circular declares the validation failed if there is any discrepancy between results.

Investigation, corrective action, and reporting

  • When testing is declared failed due to discrepancy, an investigation relative to the problem encountered must be conducted by STRADCOM.
  • Corrective action must be approved by the ITPEMC.

Resolution preparation after validation

  • The team that conducted the validation test must prepare a resolution based on the results of the test.

Hardware test procedure: stress test

  • The Memorandum Circular requires hardware testing to follow a defined procedure.
  • For the stress test, the OMR must be plugged and kept running continuously for 24 hours.

Hardware test procedure: efficiency and margin of error

  • For the efficiency test, the OMR must be fed answer sheets, and the testing must count how many answer sheets can be scanned per minute.
  • The efficiency test requires getting the average based on a five (5) set one minute interval.
  • The efficiency test requires scanning 150 answer sheets and tabulating the scores on each sheet.
  • The efficiency test requires manual checking of the answer sheets and comparison of tabulated automatic scores with manual checking scores.
  • The efficiency test requires computing the percentage of error and comparing it to the hardware specifications for margin of error.

Analyze Cases Smarter, Faster
Jur helps you analyze cases smarter to comprehend faster, building context before diving into full texts. AI-powered analysis, always verify critical details.