- Legal Principle: This Act mandates the full rehabilitation and ongoing maintenance of Kennon Road, a crucial roadway in the Philippines.
- Authority: The Department of Public Works and Highways (DPWH) is designated as the lead agency for these activities.
2. Full Rehabilitation of Kennon Road
- Provision: The DPWH is tasked with undertaking the full rehabilitation of the 33.534-kilometer stretch of Kennon Road, from Rosario, La Union to Baguio City.
- Key Requirements:
- Conduct a thorough evaluation of the current condition of the road.
- Identify necessary engineering works for effective rehabilitation.
- Important Details:
- The rehabilitation is to transform Kennon Road into an all-weather road.
3. Maintenance Responsibilities
- Provision: Post-rehabilitation, the DPWH is responsible for the ongoing maintenance of Kennon Road.
- Key Definitions:
- "Maintenance" refers to ensuring that the road remains safe and serviceable for public use.
- Important Procedures:
- The DPWH is required to implement regular assessments to uphold safety and serviceability standards.
4. Funding for Rehabilitation and Maintenance
- Provision: The necessary funds for the rehabilitation and maintenance of Kennon Road will be included in the annual General Appropriations Act.
- Key Requirements:
- Financial allocations must be planned and provided through this annual legislative process.
5. Implementation Timeline
- Provision: This Act will take effect fifteen (15) days after its publication.
- Important Details:
- Publication must occur in the Official Gazette or in a newspaper of general circulation for the Act to become effective.
6. Legislative History
- Provision: The Act originated in the House of Representatives and received approval from both Houses of Congress.
- Key Dates:
- Passed by the House of Representatives on May 20, 2020.
- Approved by the Senate on September 6, 2021.
- Signed into law by the President on December 10, 2021.
Key Takeaways
- Republic Act No. 11604 mandates the full rehabilitation and ongoing maintenance of Kennon Road under the DPWH's authority.
- A feasibility study and evaluation of the road's condition are required for effective rehabilitation.
- Funding for these activities will be sourced from the General Appropriations Act.
- The Act becomes effective fifteen days post-publication, ensuring timely implementation of road safety measures.