Title
Designation of SM Cyber West Avenue as IT Center
Law
Proclamation No. 848
Decision Date
Aug 8, 2014
President Benigno S. Aquino III designates a building in Quezon City as an Information Technology Center, in accordance with the Special Economic Zone Act of 1995, based on the recommendation of the Philippine Economic Zone Authority.

Questions (PROCLAMATION NO. 848)

It is based on the President’s powers under Republic Act No. 7916 (Special Economic Zone Act of 1995), as amended by Republic Act No. 8748.

The proclamation was issued by Benigno S. Aquino III, then President of the Philippines.

The designation was made upon the recommendation of the PEZA Board of Directors, referencing specific PEZA Board resolutions.

A building located along EDSA corner West Avenue and Bulacan Street, Quezon City, known as “SM Cyber West Avenue,” is designated as an Information Technology (IT) Center.

SM Cyber West Avenue.

Two parcels: Lot 1, Block W-24, Bsd-10781; and Lot 2, Block W-24, Bsd-10781, both in the District of Diliman, Quezon City.

An aggregate area of 2,909.50 square meters, more or less.

Lot 1: 1,515.20 square meters (more or less); Lot 2: 1,394.30 square meters (more or less).

Lot 1 is bounded NE by Lot RP 3-B-2-C (Highway 54), SE by Lot RP 3-B-2-C-3 (West Avenue), and SW by Lots 3 and 4, Block W-24 of the subdivision plan.

Lot 2 is bounded NE by Lot RP 3-B-2-C (Highway 54), SE by Lot 1, Block W-24, SW by Lot 4, Block W-24, and NW by Road Lot 28 of the subdivision plan.

Resolution No. 00-411 (s. 2000), as amended by Resolution No. 11-066 (s. 2011) and Resolution No. 12-515 (s. 2012).

It is subject to the provisions of RA No. 7916 (as amended), its Implementing Rules and Regulations, and the cited PEZA Board resolutions.

It was done in the City of Manila on August 8, 2014.

It precisely identifies and segregates the real property covered by the proclamation for legal clarity and to match the designated area to recorded/marked land parcels.

They state that the points are indicated on the plan and marked on the ground (e.g., by “BL. Cyl. Conc. Mons.”). This is important to ensure accurate boundary verification and prevent disputes over the covered area.

It specifies survey parameters used for the technical description, indicating the reference for bearings and the declination applied in determining directions.


Analyze Cases Smarter, Faster
Jur helps you analyze cases smarter to comprehend faster, building context before diving into full texts. AI-powered analysis, always verify critical details.